Team contributes to revitalization of Fenway
J. Derenzo Co. & Boston Environmental prep Hingham Shipyard for new life as multi-family, retail destination
J. Derenzo Co. preps site for Boston's largest concrete pour
J. Derenzo Co. paves the way for Skanska's high rise office tower
J. Derenzo Co. & Boston Environmental team on high profile waterfront project
Team excavates for new hospital parking garage
J. Derenzo Co. helps BU turn empty lot into state of the art field hockey field
J. Derenzo Co. manages unforeseen site conditions to bring project online on schedule
Team excavates for new hotel amongst waterfront landmarks
JDC Demolition & J Derenzo Co. work on sensitive restoration and relocation of historic church
J. Derenzo Co. plays role in historical renovation of downtown building
Lend Lease
$500,000 - $1 Million
Walsh Brothers
$1 Million - $5 Million
The team performed water and sewer cut and cap as part of ongoing demolition on the site.
John Moriarty & Associates
Less than $100,000
Shawmut Design & Construction
$1 Million - $5 Million
Barr & Barr
$1 Million - $5 Million
Suffolk Construction
$1 Million - $5 Million
CWC Builders
$1 Million - $5 Million
John Moriarty & Associates
$500,000 - $1 Million
NewRoads performed abatement work to VAT/ mastic and duct sealants throughout the occupied school.
Bacon Construction
Less than $100,000
Consigli Construction
Less than $100,000
Shawmut Design & Construction
$500,000 - $1 Million
J. Derenzo Co. performed site work for the expansion of the IKEA store in Stoughton, MA.
Dimeo Construction
Less than $100,000
Suffolk Construction
$1 Million - $5 Million
JDC Demolition performed select demolition of the existing Conrac DP #3 facility.
Suffolk Construction
Less than $100,000
Keith Construction
$1 Million - $5 Million
DPR Hardin Construction
$5 Million - $10 Million
Consigli Construction
$100,000 - $500,000
Suffolk Construction
$500,000 - $1 Million
J. Derenzo Co. performed small foundation work and utility installation.
Consigli Construction
Less than $100,000
J Derenzo Co. completed this complex road widening and infrastructure project along a high traffic area of Route 9 in front of The Mall at Chestnut Hill. The team widened 3,000 linear feet of road, replaced the interior guardrail and made infrastructure improvements including drainage, signage and signaling.
The team temporarily re-directed the existing traffic lanes, complete with line striping, to divert traffic during construction. Work was completed in two phases over a year and a half; two lanes of traffic was maintained at all times throughout construction.
J Derenzo Co. removed the guardrail and replaced it with concrete barriers. The team widened the road from two lanes to three in each direction with a breakdown lane. They milled the pavement and overlaid new asphalt on the existing lanes, then laid down a thick new slab for the third lane. At the mall entrance, the crew installed a traffic signal and added turning lanes from the main roadway.
Along the 3,000 LF stretch of road, the team updated traffic lights at two other locations; installed drainage with new catch basins and drain manholes; installed all new sidewalks and reset the curb; dug hand holes; ran conduit for new and existing traffic signals; and modified existing lights. The team completed the project will all new line striping.
New England Development
$5 Million - $10 Million
Callahan
$100,000 - $500,000
Shawmut Design & Construction
$500,000 - $1 Million
Shawmut Design & Construction
$500,000 - $1 Million
Suffolk Construction
$1 Million - $5 Million
J Derenzo Co. performed site work for the True Runner retail site.
Trinity Building & Construction
$100,000 - $500,000
J Derenzo Co. performed site work for the True Runner retail site.
Trinity Building & Construction
$100,000 - $500,000
Bilt-Rite Construction
$100,000 - $500,000
Lend Lease
$1 Million - $5 Million
Suffolk Construction
$1 Million - $5 Million
Shawmut Design & Construction
$1 Million - $5 Million