Institutional
Genzyme - 49 & 55 NY Avenue Science and CUB Buildings
Client: Genzyme / Bovis Lend Lease, Inc.
Location: New York Avenue, Framingham, MA
Schedule: 2005-Summer 2007
Contract Value: $5.4 Million
J. Derenzo Company’s completed all excavation and site work for the Central Utility
building and the Science building on this project for Genzyme. Our activities included
the following:
- Excavation & Site work for 2 new buildings and 84" pipe jacking under New York Avenue
- Excavation, site cuts and fills of about 30,000 cubic yards;
- Furnishing and installation of about 8,000 linear feet of water, sewer and drainage lines;
- Furnishing and installation of all sewer and drainage precast concrete structures
- Excavation and backfill of about 3,000 linear feet of site lighting with light pole bases;
- Excavation and backfill of about 2,500 linear feet of electric and telecom duct banks with
respective manholes;
- Open cut excavation and backfill for 1,200 linear feet of steam lines;
- Construction dewatering consisting of 15 deep wells (system that allowed a dry pipe jacking
operation;
- Design and installation of temporary earth support (3 coffer dams) for pipe jacking operation
(jacking and receiving pits)
- Pipe jacking of 84-inch ID pipe, 20-feet deep across New York Avenue for the steam lines to
provide services to other existing buildings
- Furnishing and installation of precast concrete vaults (16'x16') for steam lines installation
& maintenance;
- Site preparation work for all sidewalks and concrete pads;
- Furnishing and installation of about 4,400 linear feet of vertical granite curb;
- Furnishing and installation of about 4,200 square feet of precast concrete pavers;
- Paving of all parking and roadway areas as well as pavement markings