J. Derenzo Company
Our Services

Deep Hole Excavating
Site Development
Utility Installation
Roadway Construction
Environmental Services
Engineering Services
Snow & Ice Division

Descriptions of our core services, along with some representative projects, can be accessed by clicking on each links above or for basic services information... more >>

What's New

J. Derenzo Company Launches New Website

J. Derenzo Company has heated up the summer with the launch of a dynamic new website... more >>

 

About Us Services Portfolio Safety Equipment Community Contact Us

Portfolio
Mixed Use | Institutional | Commercial | Educational | Residential | Heavy Highway | Environmental | Portfolio Home

Educational

Boston University: Student Housing Phase II

Client: Walsh Brothers, Inc./ Boston University
Location: Boston, MA
Schedule: December 2006-2008
Contract Value: $2.5 Million

J. Derenzo Company was responsible for the site development work associated with the recent Phase II Student Housing project at Boston University. Work included the following:

  • Strip and dispose of existing asphalt parking lot;
  • Remove and stockpile existing structures and block retaining wall;
  • Install a driven, cantilevered soldier pile and lagging Earth Support System;
  • Mass excavate and remove 20,000 tons of material from the building footprint;
  • Install all on and off-site utilities including: water, sewer, and drain;
  • Furnish and install vertical granite curbing;
  • Provide gravel base and bituminous pavement parking lot and walks on site

<< Back

Search
J. Derenzo Co., 338 Howard St, Brockton, MA 02302, 508-427-6441, Fax 508-427-6488
Home | About Us | Services | Portfolio | Safety | Equipment | Community | Contact Us | What’s New
© 2006, All Rights Reserved. J. Derenzo Company. Privacy Policy. Designed by Modern Creative